Frequently Bought Together
This Item: Tungsten 220V-240V Electric Smart-Heat Mounted Heater by Bromic Heating - $775.00
SKU: BH0420030
Affinity Smart-Heat Wireless Adjustable Dimmer Controls by Bromic Heating - $762.00
SKU: BH3130061
Recess Kit for Tungsten Series Mounted Electric Heaters by Bromic Heating - $796.00
SKU: BH8180010
Total Price:
About This Item
This Bromic Tungsten Electric Heater combines industrial durability with effective industry leading technology. Featuring an extended body and a parabolic specular reflector, it offers an adjustable, even heat up to 160 square feet. The Tungsten Smart-Heat Electric unit emits minimal light and provides an ambient heating solution for any patio space.
The beautifully modern Bromic Tungsten Electric Heater series presents a wide wall of warmth which covers a vast footprint. Achieve a superior spread of heat with the Tungsten's unique mesh screen to maximize heat output and manipulate infrared energy for superior performance. Offering multiple models with heat outputs of up to 6000 watts, this durable stainless steel outdoor heater emits minimal light and provides a scalable solution wherever a heating system is required.
PRODUCT FEATURES:
- Multiple Heating Capacities:
- 2000W Model – Covers up to 65 sq. ft.
- 3000W Model – Covers up to 100 sq. ft.
- 4000W Model – Covers up to 130 sq. ft.
- 6000W Model – Covers up to 160 sq. ft.
- Energy Efficient: Available in 220V-240V with varying current options to suit different installation needs.
- Smart Control Options: Choose from on/off functionality, dimmer remote, or master remote for customized heating. (Sold Separately)
- Stylish Black Finish: Provides a modern, sophisticated look for any space.
- Safe & Certified: Intertek ETL / cETL certified for quality and safety assurance (4005951).
- Easy Installation: Requires a minimum clearance of 72 inches (wall) and 96 inches (ceiling) for safe operation.
What's Included


